精品自拍欧美v国产一区二区三区_特aaa一级毛片视频_国产47页在线观看_无码一级毛片一区二区视频3d_国产综合另类色熟女拍图_2018亚洲精品视频_无码精品成人Av一二三区_免费无码又爽又刺激高潮视频男_日韩综合久久中文字幕_国产精品怡红院成人观看

Pressure test reservation

新聞資訊

新聞資訊

Tonzo ppr quickly install the elevator base is listed in March

2017-03-30
Product pictures
 

At the time of installation, a elevator base is installed at 1 m per interval.

As shown in the figure below:

Each hanger can be up to 600N.

It's about 4.8 N per meter in full water,

600N>>>>>>4.8N。



Ensure the quality of the products is stable while ensuring the speed of installation.